Thursday, May 27, 2010

Swing Set Assembly - Day 8

Jim took a half-day off today so we were able to work during Nathan's nap. Unfortunately, this also meant working in 80+ degree weather, not fun, very hot. So we finished the fort porch frame and started working on the fort flooring. The instructions said to equally space the boards across the structure. You don't say "equally" to engineers and expect them to not follow instructions to a tee. So, of course we got out the tape measure and tried to equally space, but we soon realized that this was going to take forever since the wood was warped and only as square as could be based on the given hole locations and cuts from the company. We soon had to say this is just a swing set and that we needed to start approximating or Nathan would we too big for the set by the time we were done. This picture isn't much different from the previous, except for a couple extra boards on the fort porch, and I didn't include a picture of the floor, since it is just a floor. We got the floor half-way done though before Nathan woke up, so another 1-3/4 hours, up to 15-3/4 hours total.

No comments:

Post a Comment