Stupid instructions!!!!! Since it was raining on Monday, Jim and I worked in the garage on the fort roof. Looking ahead at the instructions, we knew that the roof would be difficult, but once we started, it was way worse. Earlier, I mentioned that we were going to add brackets to the roof "trusses" to stabilize it a little bit better for assembly, but even after the brackets, the trusses were wobbly. Then we were somehow supposed to stand them up, spaced and squared correctly, and then put 3 screws in each of the roof boards, 39 total. And the funny part was that this step did not require an adult helper, you were supposed to be able to do this yourself. The instructions did not tell us how to position the boards or if we were to start at the top or bottom, only to put 3 screws in each board; very lacking in detail and assistance. Very aggravating. So after 1-3/4 hours (up to 23), we only got this far with the roof!