Sunday, May 23, 2010

Swing Set Assembly - Day 5

Not much work on the swing set today. We found a little design flaw, and decided to rethink it which ended with us going to Lowe's. The roof for the playhouse is to be built and then attached to the fort afterwards, but it was just going to be too flimsy to assemble then move. So we decided to build it later after we got the brackets and move on to other steps. We assembled 2 rounded walls for around the slide which didn't take much time at all, but remember we did think a lot today. Another 1-1/4 hours, up to 9-1/4 total.

No comments:

Post a Comment