Monday, May 31, 2010
Swing Set Assembly - Day 11
Stupid instructions!!!!! Since it was raining on Monday, Jim and I worked in the garage on the fort roof. Looking ahead at the instructions, we knew that the roof would be difficult, but once we started, it was way worse. Earlier, I mentioned that we were going to add brackets to the roof "trusses" to stabilize it a little bit better for assembly, but even after the brackets, the trusses were wobbly. Then we were somehow supposed to stand them up, spaced and squared correctly, and then put 3 screws in each of the roof boards, 39 total. And the funny part was that this step did not require an adult helper, you were supposed to be able to do this yourself. The instructions did not tell us how to position the boards or if we were to start at the top or bottom, only to put 3 screws in each board; very lacking in detail and assistance. Very aggravating. So after 1-3/4 hours (up to 23), we only got this far with the roof!
Swing Set Assembly - Day 10
Yes we are still working on this swing set. Another 2-1/2 hours, up to 21-1/4 total. Jim and I both got up in the fort separately and decided that we needed to brace the flooring a little more than came with the set. We had extra wood in the garage but we needed to buy extra screws. We ended up adding 2 2x3's lengthwise for extra support and it definitely helped. We also worked on the porch walls and window slats and of course, more equal spacing.
Tractor!!!
Swing Set Assembly - Day 9
We worked a long time again today, another 3 hours, up to 18-3/4 total. We were able to complete the fort floor and start on the walls. More equal spacing with the walls :( It's amazing how the instructions don't mention to use clamps, and we seem to be using them all the time.
After the first 2 hours in the heat:

After another hour at night:
After the first 2 hours in the heat:
After another hour at night:
Sprinkler Fun
Sunday, May 30, 2010
Nature in Brighton
Thursday, May 27, 2010
Swing Set Assembly - Day 8
Jim took a half-day off today so we were able to work during Nathan's nap. Unfortunately, this also meant working in 80+ degree weather, not fun, very hot. So we finished the fort porch frame and started working on the fort flooring. The instructions said to equally space the boards across the structure. You don't say "equally" to engineers and expect them to not follow instructions to a tee. So, of course we got out the tape measure and tried to equally space, but we soon realized that this was going to take forever since the wood was warped and only as square as could be based on the given hole locations and cuts from the company. We soon had to say this is just a swing set and that we needed to start approximating or Nathan would we too big for the set by the time we were done. This picture isn't much different from the previous, except for a couple extra boards on the fort porch, and I didn't include a picture of the floor, since it is just a floor. We got the floor half-way done though before Nathan woke up, so another 1-3/4 hours, up to 15-3/4 hours total.
Hide and Seek
Nathan likes to play hide and seek with Jim and I, but all he does is "hide" behind us while we're on the floor and rests his head on our backs. When we ask where Nathan is and look around, he peeks around and then giggles when we "find" him. I was trying to get a video, but he stopped playing as soon as I pushed record, but here's a pic of him "hiding" from Daddy.
Nathan and the spoon
Nathan is constantly wanting the spoon while eating. I usually give it to him after he's done, but I thought that I would teach him how to use it correctly, instead of just chewing or throwing it. I think he did pretty good.
Funny face
Subscribe to:
Posts (Atom)