Tuesday, June 8, 2010

15 Months



Nathan was 15 months on Sunday and he went to the doctor for his 15 month check-up on Monday. Nathan was good considering we were there for 1-1/2 hours, and we had the first appointment. He did not like getting weighed or measured so I had to bribe him with Cheerios. He's up to 34 inches tall and weighs 27lbs-6oz. He got 2 shots, but he also got his first taste of peanut butter. The doctor said I could give him peanut butter for the first time at the office so in case there were any issues we would already be there. First, the doctor rubbed some on his arm and Nathan seemed confused, like he wanted to eat it instead. Then when I tried feeding him some, he wouldn't open his mouth, but as soon as the doctor left, he wanted a try some and loved it. No issues at all, so we are allergy free for all of the highly allergenic foods.

Nathan's up to 16 teeth, 8 on the top and 8 on the bottom. The molars aren't all the way in, but they've poked through.

He still isn't "talking", but he's babbling a lot. It might just be me not being able to understand him, but he does says Dada and Baba, and points and grunts for everything he wants. I've been trying to ignore him a little more to see if he would speak instead, and all he does is grunt louder or throw a tantrum. It's probably not nice, but Jim and I love when he throws tantrums. I don't understand how he figured it out, but he does them well. He will stomp his feet and cry and sometimes throw himself onto the ground. If he doesn't want to be picked up he'll make himself go limp and it becomes real difficult to move/lift him. Jim and I try not to laugh, but it's just too funny. I'll try to catch it on video.

He is eating everything, even though he definitely does not like some stuff. He tolerates pretty much any veggie, but absolutely hates strawberries. He'll eat strawberry yogurt, but he gags when I try to sneak a piece on his tray. He loves watermelon, cantaloupe, bananas, yogurt, graham crackers, brussel sprouts (gross!), and baked beans! And he can drink out of a straw now too!

And I'm not sure if it's because he's a boy, but he loves to fart. He giggles when he farts, and then tries to do it again. He also likes burps. Part of the reason could be because his father laughs too though, hmmmmm. I know it's gross, but it is actually kinda funny.

He loves going up and down stairs, to the point that it's exhausting for his helper. And he also loves climbing onto the couch and then getting down, which is not always the same way each time. Luckily there haven't been any crazy falls yet.

Saturday, June 5, 2010

Swing Set Assembly - Day 13

We didn't really work on the play structure today, but we did work on the new location. Since we are on a hill, we had to level out the ground. We found out that there is a 12 inch grade difference in the location that we want to put the structure so that means a lot of digging :( We decided that we aren't going to put any protective surfacing down this year since Nathan will not be playing unassisted, but we still needed to plan it out for future years. So we dug out the fort footprint area and leveled out the perimeter. Jim spent a couple hours removing grass and digging, and then I spent a 1-1/2 hours leveling the perimeter. I was out there for way longer than expected and got a little sunburn, but we're almost ready to move the structure in place. Now we just gotta find some guys to help lift!

Wednesday, June 2, 2010

Swing Set Assembly - Day 12

We worked on the roof some more and almost completed it. After the initial building, planning, and stabilizing, the roof was easy to assemble. The boards went on quickly and it looks really nice. One little snag though, we ran out of roof boards. The instructions say to use 18 on one side and 21 on the other, but we needed 18-1/2, so short 1 board. I was afraid that we assembled incorrectly, but looking at the picture and remeasuring proved that we would have had to be 2 inches off, and that was impossible. So I called the company today and asked for another board. I did complain to the lady about how the roofing instructions were horrible and not at all helpful, and she said, "Well at least you only have to build it once". What!?! So based on that response, the company may not be getting the errors that I found. I just feel bad for future buyers. Another 1-3/4 hours, up to 24-3/4.

Monday, May 31, 2010

Swing Set Assembly - Day 11

Stupid instructions!!!!! Since it was raining on Monday, Jim and I worked in the garage on the fort roof. Looking ahead at the instructions, we knew that the roof would be difficult, but once we started, it was way worse. Earlier, I mentioned that we were going to add brackets to the roof "trusses" to stabilize it a little bit better for assembly, but even after the brackets, the trusses were wobbly. Then we were somehow supposed to stand them up, spaced and squared correctly, and then put 3 screws in each of the roof boards, 39 total. And the funny part was that this step did not require an adult helper, you were supposed to be able to do this yourself. The instructions did not tell us how to position the boards or if we were to start at the top or bottom, only to put 3 screws in each board; very lacking in detail and assistance. Very aggravating. So after 1-3/4 hours (up to 23), we only got this far with the roof!

Swing Set Assembly - Day 10

Yes we are still working on this swing set. Another 2-1/2 hours, up to 21-1/4 total. Jim and I both got up in the fort separately and decided that we needed to brace the flooring a little more than came with the set. We had extra wood in the garage but we needed to buy extra screws. We ended up adding 2 2x3's lengthwise for extra support and it definitely helped. We also worked on the porch walls and window slats and of course, more equal spacing.

Tractor!!!

Nathan got his first ride on the tractor this weekend! Jim took him around the house and he really, really liked it!

Swing Set Assembly - Day 9

We worked a long time again today, another 3 hours, up to 18-3/4 total. We were able to complete the fort floor and start on the walls. More equal spacing with the walls :( It's amazing how the instructions don't mention to use clamps, and we seem to be using them all the time.

After the first 2 hours in the heat:



After another hour at night:

Sprinkler Fun

We had fun in the sprinkler this weekend. The water was cold, but he went through it a bunch of times.



This video was taken after he soaked his clothes.

Sunday, May 30, 2010

Nature in Brighton

Even though we are 15 minutes from everything, it is worth it to be so close to nature...sometimes...

Here is a good view in our backyard:



Here is a not so good view in our flower bed (about 3ft worth):

Thursday, May 27, 2010

Swing Set Assembly - Day 8

Jim took a half-day off today so we were able to work during Nathan's nap. Unfortunately, this also meant working in 80+ degree weather, not fun, very hot. So we finished the fort porch frame and started working on the fort flooring. The instructions said to equally space the boards across the structure. You don't say "equally" to engineers and expect them to not follow instructions to a tee. So, of course we got out the tape measure and tried to equally space, but we soon realized that this was going to take forever since the wood was warped and only as square as could be based on the given hole locations and cuts from the company. We soon had to say this is just a swing set and that we needed to start approximating or Nathan would we too big for the set by the time we were done. This picture isn't much different from the previous, except for a couple extra boards on the fort porch, and I didn't include a picture of the floor, since it is just a floor. We got the floor half-way done though before Nathan woke up, so another 1-3/4 hours, up to 15-3/4 hours total.