Thursday, May 27, 2010
Hide and Seek
Nathan likes to play hide and seek with Jim and I, but all he does is "hide" behind us while we're on the floor and rests his head on our backs. When we ask where Nathan is and look around, he peeks around and then giggles when we "find" him. I was trying to get a video, but he stopped playing as soon as I pushed record, but here's a pic of him "hiding" from Daddy.
Nathan and the spoon
Nathan is constantly wanting the spoon while eating. I usually give it to him after he's done, but I thought that I would teach him how to use it correctly, instead of just chewing or throwing it. I think he did pretty good.
Funny face
Swing Set Assembly - Day 7
We didn't get much done today. Step 12 needed a lot of measurements and accuracy for it to be level and square. We pretty much started building the frame for the fort porch, but didn't finish it because the bugs were attacking. There is another thing that I would have redone in the instructions. It told us to screw each piece to the structure separately and Jim and I both think that building the porch on the ground and then screwing the whole thing to the structure would have been a lot easier. Another 1-1/4 hours, up to 14, the amount of hours the instructions say it would take to complete and I don't think we're half-way done yet. Still having fun though.
Wednesday, May 26, 2010
Swing Set Assembly - Day 6
We got a lot of work done yesterday, another 3-1/2 hours, up to 12-3/4 hours total. And this thing is going to be big. A small step ladder wasn't cutting it and we had to break out the big ladder. Last night we got steps 6-11 complete, which pretty much means we built the fort frame. There are a couple more steps of just frame building, and then we will be building the fort floor, wall, and then roof. Here's a picture of our progress. As you can see it was night time when I took the picture, 11pm to be exact.
Sunday, May 23, 2010
Swing Set Assembly - Day 5
Not much work on the swing set today. We found a little design flaw, and decided to rethink it which ended with us going to Lowe's. The roof for the playhouse is to be built and then attached to the fort afterwards, but it was just going to be too flimsy to assemble then move. So we decided to build it later after we got the brackets and move on to other steps. We assembled 2 rounded walls for around the slide which didn't take much time at all, but remember we did think a lot today. Another 1-1/4 hours, up to 9-1/4 total.
Where's your nose?
I've been teaching Nathan his body parts. He knows where his feet, toes, head, hair, ears, hands, and belly are. When he finds his belly, he lifts his shirt and taps it! I've been trying to get him to find his nose, but it's been a little more difficult. So the other day he finally finds his nose, but unfortunately here is what I saw...(not exactly what I had in mind)...
Swing Set Assembly - Day 4
Saturday was a very ambitious day. We logged 3-1/2 more hours. I will not be counting man hours anymore since it pretty much seems like 2 people are always supposed to be working on it. So we are up to 8 total hours working together. We're making headway and my car has been kicked out of the garage :( We finished the rock wall, the ladder, the side walls of the structure, and the swing assembly. The swing assembly was a little difficult, but so far so good.


I am actually really enjoying this project so far, but the instructions are frustrating me. I am finding typos and errors everywhere. The 3 pieces that we had to reorder because we thought they sent the wrong pieces were actually right, the picture on the materials page was wrong. I realized this after they sent the identical pieces again, and then looked ahead in the instructions to see where to use the pieces. Also, they are calling out the wrong pieces to use when a piece doesn't exist. Obviously these CAD people aren't double-checking their work. I'm expecting a paycheck from the company soon for catching these errors for them!
I am actually really enjoying this project so far, but the instructions are frustrating me. I am finding typos and errors everywhere. The 3 pieces that we had to reorder because we thought they sent the wrong pieces were actually right, the picture on the materials page was wrong. I realized this after they sent the identical pieces again, and then looked ahead in the instructions to see where to use the pieces. Also, they are calling out the wrong pieces to use when a piece doesn't exist. Obviously these CAD people aren't double-checking their work. I'm expecting a paycheck from the company soon for catching these errors for them!
Just like Daddy...
Saturday, May 22, 2010
Swing Set Assembly - Day 3
We finally started assembling the play set. We decided to start with step 1, but unfortunately, this included putting the rock wall together; the rock wall that we are replacing with a second slide for the first couple years. Jim thought it could be practice. It took us an hour just to put all the wood together, so we just need to put the plastic rocks on, and we will have step 1 done. So 2 more man hours, up to 9 total.
Subscribe to:
Posts (Atom)