Wednesday, June 16, 2010

Swing Set Assembly - Day 19

We attached the swing assembly to the fort structure today. It was actually a pretty easy step, except that we had to level it. We ended up having to add wood to the one end and dig into the ground for the other, but it is perfectly level now. Another 1-1/2 hours, up to 40-1/2 total.

Swing Set Assembly - Day 18

We attached the crowsnest today; the raised platform where the slide will attach to. Even with the walls already assembled, it still took 4 hours to build. Up to 39 hours total.

Friday, June 11, 2010

Happy Birthday Daddy!

Happy Birthday Babe!

Here's a pic of Jim and Nathan a year ago.

Thursday, June 10, 2010

Swing Set Assembly - Day 17

We have a roof, well an attached roof!!! I thought it would have gone more smoothly, but there were some issues. We found another mistake in the instructions; one of the boards was assembled backwards. Also, we had to loosen/move a board to get the roof to sit level. After 4 guys and me (as the supervisor!), the roof looks great. Only 45 minutes tonight, so up to 35 total.

Chillin'

Here is Nathan chillin' on the couch watching tv. Do I really need to say anymore?

Swing Set Assembly - Day 16

The playset has an attached picnic table. You would think that it wouldn't be that difficult to build, but it actually took a lot longer than expected; too many thing to level/square/line up all at the same time. Another 2-1/2 hours, up to 34-1/4 total. And Nathan finally got to play on it!





The turtle is back

Every spring, for the past 3 years, we've had the same turtle visit us to find a spot for her eggs, and we were wondering if something had happened to her, but she finally showed up. Even though I'm glad she's back, she messes up my flower garden by digging holes in my mulch.

Here she is on the front walkway:


Here she is in my front flower bed:


Here she is in the backyard:


I also found her in the garage right by the steps and Jim has found her under his truck. Nathan likes her, but Dizzie definitely does not!

Swing Set Assembly - Day 15

We leveled the playset today. It seemed like we were playing in the dirt more than anything, but it worked. Our delivery for the extra roof board came, so we finished the porch roof and fort roof. Another 3-1/2 hours, 31-3/4 hours total.

John Deere

Jim finally got his new tractor. After a lot of researching (like years!), he finally decided on the John Deere X500. It is quite a bit bigger than his other one and he was able to cut 30 minutes off the total lawn cut time! Nathan likes it too, but now every time we go in the garage, he has to sit on both tractors.

Here is Jim showing Nathan how it works:

Swing Set Assembly - Day 14

We were able to talk a couple of the neighbors into helping move the structure to the backyard. Luckily they have kids who will benefit from the structure! From my view, it looked like a pretty simple task, but Jim mentioned that it was a bit heavy. Once it was in place, it was pretty level; we just needed to raise the one side 1/4 inch. Prior to moving it, we had to build a little, so a total of 3 more hours, up to 28-1/4 hours total (this is going to include any site prep time too).